T.K.STAR TEAM New Century Project broke ground on April 26th 2017. Mr. Xu Xingchun, President and General Manager of Xing’anji Engineering Co., Ltd. of CCCC THEC, presided the commencement ceremony and delivered a speech, accompanied by the Deputy General Manager, Mr. Wang Lijun and the General Manager of the Cambodia Branch Office, Mr. Han Bing. The President of the T.K STAR TEAM Peng Yixing and the Chairman of the Board Mr. Zhang Zhensong also attended by invitation and addressed the ceremony. The proposed 34-storey housing project (plus 5 underground floors) located in Tuolkok District, Phnom Penh is awarded at a winning bid price of RMB 420 million and is proposed to be completed in 42 months. The number of the foundation pits are the most of its kind in the Cambodian market. The cutting-edge unmanned automatic parking system will be adopted in this landmark building-to-be. The increasingly fierce competition in the housing project market in Cambodia leaves us no choice but to join the price competition with state-owned enterprises such as China State Construction Engineering Corporation (CSCEC) and Metallurgical Corporation of China (MCC) and those leading engineering enterprises at provincial level with a high marketization degree, such as Sino Great Wall Co., Ltd (SGW), Sichuan Huashi Group Co., Ltd. and Jiangsu Huajian Co., Ltd. Experienced Cambodian companies shall not be overlooked as well. The project is a hard-won thanks to the great support of the top management at all levels, the continuous business operation of the Cambodian Branch Office and the joint efforts made by the Project Management. The commencement ceremony makes the T.K.STAR TEAM New Century Project the fifth project under construction by Xing’anji Engineering Co., Ltd. We are very optimistic about and will follow up on the Phnom Penh Port Extension Project. (by Gao Liwen, Picture by: in Xiaozhong)
|